The railway bridge opposite Tanya Hotel in Vasco is in a damaged condition and under repairs. The concrete structure below the railway tracks is leaking and is almost on the verge of collapse and needs repairs.
The railway authorities along with PWD and local MLA should consider the repair work on top priority before any untoward incident happens. ‘A stitch in time saves nine’, the proverb is applicable in this case and timely action will save the cost and lives of the general public passing through this road.

