GOAHeavy duty transformer commissioned at CalanguteCALANGUTE: Calangute MLA Michael Lobo inaugurated a 400 KVA transformer at Khobra Vaddo, Calangute, to meet the existing power consumption needs of the locals. By Team Herald Published: 30 May 2014 Share SHARE https://heraldgoa.in/goa/na/heavy-duty-transformer-commissioned-at-calangute/74056 TAGGED:Calangutecommissioneddutyheavytransformer Share This Article Facebook Whatsapp Whatsapp Copy Link Previous Article Carmona march into semi-finals Next Article Sapu lake being excavated to prepare ground for water storage. Construction material is seen stacked on the banks to build an embankment